Email: truman.lau@outlook.com

Tel: +86 13783197063

Home

Product

Cases

Blog

About us

Contact us

Enterprise news
Enterprise news
New product training was successfully held
2019-11-02
Read more
New product training was successfully held
In order to further deepen employees' understanding of product knowledge, improve employee marketing level, and provide customers with efficient and convenient services at a more professional level. In early March, we held product training meeting in the company conference room, and more than 100 sales personnel participated in the training.
Based on quality, challenge the future
2019-11-02
Read more
Based on quality, challenge the future
Since we researched and developed the reinforcement steel equipment, we have been focusing on quality improvement and continuous research, product of stable performance and strong applicability ,which is favored by customers.
The first "Amoeba Business Model" training conference ended successfully
2019-11-02
Read more
The first "Amoeba Business Model" training conference ended successfully
From July 20th to 21st, the two-day “Amoeba Business Model” training conference was successfully concluded , which marked the official launch of the company's introduction of the Amoeba operation model. Wan Tao, secretary of the party branch of the company, Cui Zhengfeng, Sun Zilin, deputy general manager, Bu Zhiqiang, general manager of Luoyang Company, Liu Zhendong, general manager of the company, department heads, workshop team leaders and logistics personnel participated in the training.
Industry information
Notes on Tunnel Shotcrete
2019/11/02
​At present, the advancement of science and technology has constantly improved our requirements on tunnel construction ,and concrete shotcrete equipment has become the standard equipment for tunnel construction. What requirements should be paid attention to during tunnel construction? In fact, it is mainly to analyze the considerations for tunnel shotcrete from two aspects: safety and shotcrete quality.
Notes on Tunnel Shotcrete
Tips on drilling grouting
2019/11/02
During the drilling and grouting process, it is prone to difficulties in drilling, deformation or displacement of the track line, running slurry and etc. Different strategies should be taken for different problems.
Tips on drilling grouting
Maintenance skills for variable frequency air compressor and screw air compressor
2019/11/02
Lubrication system refueling method and oil change method 1.lubrication refuelAlways check the amount of lubricating oil during the use of air compressor,if the oil level is too low, it should be replenished in time.2.Filling method for lubricating oil When the air compressor stopped and the internal pressure is released,after confirming the system is not under pressure,then pull down the main power switch.Open the fuel filler on the oil and gas separation tank ,and add an appropriate amount of
Maintenance skills for variable frequency air compressor and screw air compressor
Tips on Tunnel concrete construction
2019/11/02
In the tunnel construction, shotcrete is the necessary construction content often involved in initial support and secondary lining,its quality has a significant impact on the durability of tunnel construction . Luoyang Gentong has compiled a number of technical measures that cannot be ignored in the construction of shotcrete.
Tips on Tunnel concrete construction

Want To Discuss About Your Machine Needs?

CONTACT US
@ Copyright of Luoyang Gentong Engineering Equipment Co., Ltd. All rights reserved.
Want To Discuss About Your Machine Needs?
Contact us
@ Copyright of Luoyang Gentong Engineering Equipment Co., Ltd. All rights reserved.