Email: truman.lau@outlook.com

Tel: +86 13783197063

Home

Product

Cases

Blog

About us

Contact us

Engineering case
Bozhou branch railway subgrade construction
Case introduction
The main line of Bozhou Spur Railway is 49.67 km long. It involves a total of three stations, namely Bole, Shuanghe and Bortala, with a total investment of 1.14 billion yuan. The Alatau Mountain Tunnel is the only single-line tunnel project in the whole line, with a length of 2,585 meters. Two-way construction of the tunnel. From June , the construction method was manually punched and replaced with a three-arm rock drilling rig for mechanical drilling. The daily progress of the tunnel was 6 meters, which accelerated the progress of the tunnel and accelerated the tunneling process.
Equipment configuration
Related case
Hot products
Contact us
Please contact us if you have any questions.
+86 13783197063
online customer service
truman.lau@outlook.com
Give Us A Shout
SEND

Want To Discuss About Your Machine Needs?

CONTACT US
@ Copyright of Luoyang Gentong Engineering Equipment Co., Ltd. All rights reserved.
Want To Discuss About Your Machine Needs?
Contact us
@ Copyright of Luoyang Gentong Engineering Equipment Co., Ltd. All rights reserved.